30 / Mar / 2012

 

60. M. SECTOR ROAD
•MEDIAN WORK IN PROGRESS
•TREE PLANTATION WORK IN PROGRESS
•ROAD LIGHT WORK COMPLETED
30 / Mar / 2012

 

60. M. SECTOR ROAD
•MEDIAN WORK COMPLETED
•TREE PLANTATION WORK COMPLETED
•ROAD LIGHT WORK COMPLETED

 

30 / Mar / 2012

 

60M. SECTOR ROAD WORK IN PROGRESS
30 / Mar / 2012

 

24M. INTERNAL ROAD WORK IN PROGRESS IN SECTOR 83
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82F (360 sq. yds.)
•TERRACE SLAB CASTING COMPLETED FOR 06 UNITS
•2nd FLR COLUMN CASTING IN PROGRESS
•EXTERNAL PLASTER IN PROGRESS
•BRICK WORK IN PROGRESS

 

30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82F (360 sq. yds.)
•2ND FLR SLAB CASTING COMPLETED FOR 06 PLOTS
•2ND FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82F (360 sq. yds.)
•COLUMN CASTING IN PROGRESS
•TIE BEAM CASTING COMPLETEDFOR 08 NO
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82F (400 sq. yds.)
•1ST FLOOR SLAB SHUTTERING IN PROGRESS FOR 1/6 No. TYPE-E PLOTS
•COLUMN CASTING IN PROGRESS
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82B (360 sq. yds.)
•TERRACE SLAB CASTING COMPLETED FOR 12 NOS. TYPE-D PLOTS
•MUMTY CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
•SERVICE WORK IN PROGRESS
30 / Mar / 2012

 

24M. INTERNAL ROAD WORK IN PROGRESS IN SECTOR 83
30 / Mar / 2012

 

24M. INTERNAL ROAD WORK COMPLETED IN SECTOR 82
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82F (400 sq. yds.)
•COLUMN CASTING IN PROGRESS FOR 6 NOS.
•TIE BEAM CASTING COMPLETED FOR 6 NOS
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82B (360 sq. yds.)
•TERRACE SLAB CASTING COMPLETED FOR 3 No.
•MUMTY CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82F (400 sq. yds.)
•2ND FLR SLAB CASTING COMPLETED FOR 05 NO.
•2nd FLR SLAB CASTING IN PROGRESS
•1st FLR SLAB CASTING COMPLETED FOR 8 NOS.
30 / Mar / 2012

 

PREMIUM FLOORS SECTOR 82E (360 sq. yds.)
•TERRACE SLAB CASTING COMPLETED FOR 4 NO. TYPE-D PLOTS
•BRICK WORK IN PROGRESS
30 / Mar / 2012

 

PREMIUM FLOORS SECTOR 82B (360 sq. yds.)
•TIE BEAM CASTING COMPLETED FOR 4 NOS TYPE- D PLOTS
•COLUMN CASTING IN PROGRESS
•BACK FILLING IN PROGRESS
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82B (360 sq. yds.)
•TERRACE SLAB CASTING COMPLETED FOR 7NOS.
•MUMTY COLUMN CASTING IN PROGRESS
•2ND FLR COLUMN CASTING COMPLETED
•BRICK WORK IN PROGRESS
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82F (400 sq. yds.)
•BACK FILLING IN PROGRESS FOR 5 NOS.
•TIE BEAM CASTING IN PROGRESS
•PADESTAL CASTING COMPLETED
30 / Mar / 2012

 

PREMIUM FLOORS SECTOR 82F (400 sq. yds.)
•PADESTAL CASTING COMPLETED FOR 02 NOS. TYPE-E PLOTS
• EXCAVATION COMPLETED FOR 4 NOS. TYPE-E PLOTS
30 / Mar / 2012

 

PREMIUM FLOORS SECTOR 82E (360 sq. yds.)
•TIE BEAM CASTING IN PROGRESS FOR 10 NO. TYPE-D PLOTS
•BACK FILLING IN PROGRESS
•COLUMN CASTING IN PROGRESS
30 / Mar / 2012

 

PREMIUM FLOORSSECTOR 82B (400 sq. yds.)
•TERRACE SLAB CASTING COMPLETED FOR 06 NOS. OF TYPE-E PLOTS
•MUMTY CASTING COMPLETED
•BRICK WORK IN PROGRESS
29 / Feb / 2012

 

24. M. ROAD
•24. M. ROAD WORK IN PROGRESS IN BETWEEN SEC 82B & F
•TREE PLANTATION WORK COMPLETED
•MEDIAN WORK IN PROGRESS
29 / Feb / 2012

 

SECTOR 82B (360 sq yds)
•TERRACE SLAB CASTING COMPLETED FOR 12 NOS. PLOTS
•2ND FLR SLAB CASTING COMPLETED
•BRICK WORK IN PROGRESS
•SERVICE WORK IN PROGRESS
29 / Feb / 2012

 

SECTOR 82E (360 sq yds)
•TIE BEAM CASTING IN PROGRESS FOR 10 NO. PLOTS
•BACK FILLING IN PROGRESS
•COLUMN CASTING IN PROGRESS
29 / Feb / 2012

 

60. M. SECTOR ROAD
•MEDIAN WORK IN PROGRESS
•TREE PLANTATION WORK IN POROGRESS
•ROAD LIGHT WORK COMPLETED
29 / Feb / 2012

 

 60. M. SECTOR ROAD
•MEDIAN WORK COMPLETED
•TREE PLANTATION WORK COMPLETED
•ROAD LIGHT WORK COMPLETED
29 / Feb / 2012

 

75 M. SECTOR ROAD
•75. M. SECTOR ROAD WORK IN PROGRESS
•MEDIAN WORK IN PROGRESS
29 / Feb / 2012

 

•60 M. SECTOR ROAD WORK IN PROGRESS
29 / Feb / 2012

 

•24 M. ROAD WORK IN PROGRESS IN SEC-83
29 / Feb / 2012

 

•24 M. ROAD WORK COMPLETED IN SEC-82A
29 / Feb / 2012

 

SECTOR 82F (360 & 400 sq yds)
•TIE BEAM CASTING COMPLETED FOR 6 NOS. PLOTS
•COLUMN CASTING IN PROGRESS
29 / Feb / 2012

 

SECTOR 82F (400 sq yds)
•PADESTAL CASTING IN PROGRESS FOR 5NOS. PLOTS
•EXCAVATION COMPLETYED FOR TYPE-E PLOTS
29 / Feb / 2012

 

SECTOR 82B (400 sq yds)
•TERRACE SLAB CASTING COMPLETED FOR 06 NOS. PLOTS
•MUMTY CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
29 / Feb / 2012

 

SECTOR 82F (360 sq yds)
•TERRACE SLAB CASTING COMPLETED FOR 06 UNITS
•2nd FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
29 / Feb / 2012

 

•15 M. ROAD WORK IN PROGRESS IN SEC-82B
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 360 sq. yd.)
•TERRACE SLAB CASTING COMPLETED FOR 06 UNITS
•2nd FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 400 sq. yd.)
•TIE BEAM CASTING COMPLETED FOR 6 NOS PLOTS
•COLUMN CASTING IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 400 sq. yd.)
•TIE BEAM CASTING IN PROGRESS FOR 6 No. TYPE-E PLOTS
•COLUMN CASTING IN PROGRESS
•BACK FILLING COMPLETED
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 360 sq. yd.)
•COLUMN CASTING IN PROGRESS
•TIE BEAM CASTING COMPLETEDFOR 08 NO PLOTS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82B - 400 sq. yd.)
•TERRACE SLAB CASTING COMPLETED FOR 06 NOS. OF TYPE-E PLOTS
•MUMTY CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82B - 360 sq. yd.)
•TIE BEAM CASTING COMPLETED FOR 4 NOS PLOTS
•COLUMN CASTING IN PROGRESS
•BACK FILLING IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 360 sq. yd.)
•2nd FLOOR SLAB CASTING COMPLETED FOR 06 PLOTS
•2nd FLOOR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 400 sq. yd.)
•2nd FLOOR SLAB CASTING COMPLETED FOR 01 NO. TYPE-E PLOT
•1st FLOOR SLAB CASTING COMPLETED FOR 4/8 NOS. TYPE-E PLOTS
•COLUMN CASTING IN PROGRESS

 

31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 400 sq. yd.)
•PADESTAL CASTING IN PROGRESS FOR 5 NOS. TYPE-E PLOTS
•EXCAVATION COMPLETED FOR TYPE-E PLOTS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82F - 400 sq. yd.)
•PADESTAL CASTING COMPLETED FOR 02 NOS. TYPE-E PLOTS
•EXCAVATION COMPLETED FOR 4 NOS. TYPE-E PLOTS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82B - 360 sq. yd.)
•TERRACE SLAB CASTING COMPLETED FOR 12 NOS. TYPE-D PLOTS
•2ND FLR SLAB CASTING COMPLETED
•BRICK WORK IN PROGRESS
•SERVICE WORK IN PROGRESS
31 / Jan / 2012

 

60. M. SECTOR ROAD
•MEDIAN WORK IN PROGRESS
•TREE PLANTATION WORK IN POROGRESS
•ROAD LIGHT WORK COMPLETED
31 / Jan / 2012

 

• 75. M. SECTOR ROAD WORK IN PROGRESS
• MEDIAN WORK IN PROGRESS
31 / Jan / 2012

 

• 24. M. ROAD WORK IN PROGRESS IN BETWEEN SEC-82B & F
• TREE PLANTATION WORK COMPLETED
• MEDIAN WORK IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82B - 360 sq. yd.)
•TERRACE SLAB CASTING COMPLETED FOR 3 No. PLOTS
•MUMTY CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
31 / Jan / 2012

 

• 12. M. ROAD WORK IN PROGRESS IN SEC-82B
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82E - 360 sq. yd.)
•TIE BEAM CASTING IN PROGRESS FOR 10 NO. TYPE-D PLOTS
•BACK FILLING IN PROGRESS
•COLUMN CASTING IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82E - 360 sq. yd.)
•PADESTAL CASTING COMPLETED FOR 4 NOS OF PLOTS
•BACK FILLING IN PROGRESS
31 / Jan / 2012

 

PREMIUM FLOORS (SECTOR 82E - 360 sq. yd.)
•2nd FLOOR SLAB CASTING IN PROGRESS FOR 4 NO. PLOTS
•1st FLOOR SLAB CASTING COMPLETED FOR 4 NOS PLOTS
•FOUNDATION WORK COMPLETED FOR 8 NO. PLOTS
31 / Jan / 2012

 

60. M. SECTOR ROAD
•MEDIAN WORK COMPLETED
•TREE PLANTATION WORK COMPLETED
•ROAD LIGHT WORK COMPLETED
31 / Jan / 2012

 

• 60M. SECTOR ROAD WORK IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 360 Sq. Yds.)
•2ND FLR SLAB CASTING COMPLETED FOR 06 PLOTS
•2ND FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 360 Sq. Yds.)
•TIE BEAM CASTING COMPLETEDFOR 08 NO D-TYPE (360 SQYD.) PLOTS
•COLUMN CASTING IN PROGRESS
30 / Dec / 2011

 

60. M. SECTOR ROAD
·   MEDIAN WORK IN PROGRESS
·   TREE PLANTATION WORK IN PROGRESS
·   ROAD LIGHT WORK COMPLETED
 
 
30 / Dec / 2011

 

60. M. SECTOR ROAD
·   MEDIAN WORK IN PROGRESS
·   TREE PLANTATION WORK IN PROGRESS
·   ROAD LIGHT WORK COMPLETED

 

30 / Dec / 2011

 

75. M. SECTOR ROAD-6 WORK IN PROGRESS
·   MEDIAN WORK IN PROGRESS
30 / Dec / 2011

 

24. M. ROAD WORK IN PROGRESS BETWEEN SEC-IN SEC 82B & F
·   TREE PLANTATION WORK COMPLETED
·   MEDIAN WORK IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 360 Sq. Yds.)
•TERRACE SLAB CASTING COMPLETED FOR 06 UNITS
•2nd FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82B - 360 Sq. Yds.)
•TERRACE SLAB CASTING COMPLETED FOR 10 NOS. PLOTS
•2ND FLR SLAB CASTING COMPLETED
•BRICK WORK IN PROGRESS
•SERVICE WORK IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82B - 360 Sq. Yds.)
•2ND FLR SLAB CASTING COMPLETED FOR 7NOS. PLOTS
•2ND FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82B - 360 Sq. Yds.)
•TIE BEAM CASTING IN PROGRESS FOR 4 NOS PLOTS
•BACK FILLING IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82B - 400 Sq. Yds.)
•TERRACE SLAB CASTING COMPLETED FOR 04 NOS. PLOTS
•BRICK WORK IN PROGRESS
30 / Dec / 2011

 

MATRIKIRAN HIGH SCHOOL
•EXCAVATION IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 400 Sq. Yds.)
•TIE BEAM CASTING COMPLETED FOR 06 NOS. PLOTS
•COLUMN CASTING IN PROGRESS
•BACK FILLING COMPLETED
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 500 Sq. Yds.)
•P.C.C. WORK IN PROGRESS FOR 5 NOS. PLOTS
•FOUNDATION IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 500 Sq. Yds.)
•PADESTAL CASTING COMPLETED FOR 02 NOS. PLOTS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82E - 360 Sq. Yds.)
•PADESTAL CASTING IN PROGRESS FOR 8 NO. PLOTS
•BACK FILLING IN PROGRESS
•COLUMN CASTING IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82E - 360 Sq. Yds.)
•EXCAVATION COMPLETED FOR 8 NO. PLOTS
•P.C.C. WORK IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82E - 360 Sq. Yds.)
•P.C.C WORK INPROGRESS FOR 8NOS OF PLOTS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 400 Sq. Yds.)
•TIE BEAM CASTING COMPLETED FOR 6 NOS. PLOTS
•COLUMN CASTING IN PROGRESS
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82F - 400 Sq. Yds.)
•TIE BEAM CASTING IN PROGRESS FOR 3 No. PLOTS
•BACK FILLING COMPLETED
30 / Dec / 2011

 

PREMIUM FLOORS (SECTOR-82B - 360 Sq. Yds.)
•1ST FLR SLAB CASTING COMPLETED FOR 3 NO. PLOTS
•1ST FLR COLUMN CASTING IN PROGRESS
30 / Dec / 2011

 

60M. SECTOR ROAD-3 WORK IN PROGRESS
30 / Dec / 2011

 

 15. M. ROAD WORK IN PROGRESS IN SEC-82E
30 / Dec / 2011

 

12. M. ROAD WORK IN PROGRESS IN SEC-82B
30 / Nov / 2011

 

EXCAVATION IN PROGRESS FOR MATRIKIRAN HIGH SCHOOL

 

30 / Nov / 2011

 

 
75. M. SECTOR ROAD-6 WORK IN PROGRESS
MEDIAN WORK IN PROGRESS
TREE PLANTATION WORK IN POROGRESS
ROAD LIGHT WORK IN PROGRESS
30 / Nov / 2011

 

60. M. SECTOR ROAD-2 WORK IN PROGRESS
MEDIAN WORK IN PROGRESS
TREE PLANTATION WORK IN POROGRESS
ROAD LIGHT WORK IN PROGRESS
 
30 / Nov / 2011

 

PREMIUM FLOORS (SECTOR-82F)
•TERRACE SLAB CASTING COMPLETED FOR 06 UNITS
•2nd FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
30 / Nov / 2011

 

PREMIUM FLOORS (SECTOR-82F)
•2ND FLR SLAB CASTING COMPLETED FOR 06 PLOTS
•2ND FLR COLUMN CASTING IN PROGRESS
•BRICK WORK IN PROGRESS
30 / Nov / 2011

 

PREMIUM FLOORS - SECTOR 82F – TYPE F
·   P.C.C. WORK IN PROGRESS FOR 5NOS. TYPE-F PLOTS
·   FOUNDATION IN PROGRESS.
30 / Nov / 2011

 

PREMIUM FLOORS - SECTOR 82B (360 sq. yd.)

·   2ND FLR SLAB CASTING COMPLETED FOR 7NOS. TYPE-D (360 sq. yd.) PLOTS

·   2ND FLR COLUMN CASTING IN PROGRESS

·   BRICK WORK IN PROGRESS

30 / Nov / 2011

 

PREMIUM FLOORS - SECTOR 82B (360 sq. yd.)
•TERRACE SLAB CASTING COMPLETED FOR 10 NOS. TYPE-D (360 sq. yd.) PLOTS
•2ND FLR SLAB CASTING COMPLETED
•BRICK WORK IN PROGRESS
•SERVICE WORK IN PROGRESS
30 / Nov / 2011

 

PREMIUM FLOORS - SECTOR 82B (360 sq. yd.)
·   1ST FLR SLAB CASTING COMPLETED FOR 3NO. TYPE-D (360 sq. yd.) PLOTS
·   1ST FLR COLUMN CASTING IN PROGRESS
30 / Nov / 2011

 

 
60. M. SECTOR ROAD-1 WORK IN PROGRESS
MEDIAN WORK IN PROGRESS
TREE PLANTATION WORK IN PROGRESS
ROAD LIGHT WORK IN PROGRESS
30 / Nov / 2011

 

60. M. SECTOR ROAD-1 WORK IN PROGRESS
MEDIAN WORK IN PROGRESS
TREE PLANTATION WORK IN PROGRESS
ROAD LIGHT WORK IN PROGRESS
30 / Nov / 2011

 

60. M. SECTOR ROAD-2 WORK IN PROGRESS
MEDIAN WORK IN PROGRESS
TREE PLANTATION WORK IN POROGRESS
ROAD LIGHT WORK IN PROGRESS
 
30 / Nov / 2011

 

75. M. SECTOR ROAD-6 WORK IN PROGRESS
MEDIAN WORK IN PROGRESS
TREE PLANTATION WORK IN POROGRESS
ROAD LIGHT WORK IN PROGRESS
30 / Nov / 2011

 

24. M. ROAD WORK IN PROGRESS IN BETWEEN SEC-82B & F
30 / Nov / 2011

 

PREMIUM FLOORS (SECTOR 82F) – TYPE F
PADESTAL CASTING COMPLETED FOR 02 NOS. TYPE F (500 sq. yd.) PLOTS
30 / Nov / 2011

 

PREMIUM FLOORS - SECTOR-82F – TYPE D (360 SQ.YDS.)
•TIE BEAM CASTING COMPLETEDFOR 08 NO D-TYPE (360 SQYD.) PLOTS
•COLUMN CASTING IN PROGRESS
06 / Dec / 2010
Excavation Completed For (7+7) Nos Of Emilia Plots
04 / Dec / 2010

Tower-E1

  • 4th FLR slab casting in progress
  • 3rd Floor column casting in progress

Tower-E2

  • 3rd FLR slab casting completed
  • 3rd FLR column casting in progress
04 / Dec / 2010

Tower-B1

  • 3rd FLR column casting in progress
  • 3rd FLR slab casting in progress
  • Brick work in progress

Tower-B2

  • Column casting in progress
  • Column casting in progress
04 / Dec / 2010
  • Footing casting completed for A5 block
  • Padestal casting in progress
  • Column casting in progress

Back Filling In Progress For A6 Block

04 / Dec / 2010

Excavation In Progress

14 / Oct / 2010

MUMTY CASTING IN PROGRESS
BRICKWORK IN PROGRESS

14 / Oct / 2010
14 / Oct / 2010

2ndFLR SLAB COMPLETED FOR 10 NOS OF PLOT
G.F COLUMN CASTING IN PROGRESS
2NDFLR SLAB CASTING IN PROGRESS

1STFLR SLAB COMPLETED.
2NDFLR SLAB COMPLETED
TERRACE SLAB CASTING IN PROGRESS

14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
14 / Oct / 2010
01 / Oct / 2010
Tower-D,
  • Back Filling In Progress
  • Column Casting In Progress
  • Brickwork Below Tie Beam In Completed
01 / Oct / 2010
  • Padestal Casting In Progress For A1-Block In Progress
01 / Oct / 2010
  • Road Sub-Base Work In Progress
01 / Oct / 2010
  • Road Sub-Base Work In Progress
01 / Oct / 2010
  • Block-B Internal Finishing Work In Progress
01 / Oct / 2010
Tower-E1
  • 2nd flr Slab Casting In Progress
  • 2nd floor Column Casting In Progress
01 / Oct / 2010
  • Footing Casting In Progress For A5 & A6 Block
01 / Oct / 2010
  • Brickwork In Progress
  • Services Work In Progress
  • Mumty Casting In Progress
01 / Oct / 2010
  • Mumty casting in progress
  • brickwork in progress
01 / Oct / 2010
  • Back filling completed for (4+4) 08 nos of iris plots.
01 / Oct / 2010
  • 2nd flr Slab Completed For 10 Nos Of Plot
  • G.F Column Casting In Progress
  • 2nd flr Slab Casting In Progress
     
  • 1st flr Slab Completed
  • 2nd flr Slab Completed
  • Terrace Slab Casting In Progress
01 / Oct / 2010

Column Casting & Slab Shuttring In Progress For Terrace

  • Internal Plaster In Progress
  • Brick Work In Progress
01 / Oct / 2010
Tower-F2,
  • Tie Beam To Be Started
  • Back Filling Completed
01 / Oct / 2010
Tower-F3,
  • 1st flr Slab Casting Completed
  • 1st Flr Column Casting In Progress
  • 2nd flr Slab Shuttering In Progress
01 / Oct / 2010
  • Basement Retaining Wall In Progress
01 / Oct / 2010
30 / Sep / 2010
  • 1stflr Slab Casting Completed
  • 1st flr Column Casting In Progress
  • Brick Work In Progress
30 / Sep / 2010
  • 1st& 2nd flr Slab Casting Completed For 4 Nos Of Iris Plot
  • Terrace Flr Slab Casting In Progress
  • Brick Work In Progress
30 / Sep / 2010
  • Excavation Completed For (7+7) Nos Of Emilia Plots
30 / Sep / 2010
  • 2nd floor Slab Casting For 4 Plots In Progress
  • Terrace Slab Shuttering In Progress
  • Column Casting In Progress
  • Brick Work In Progress
30 / Sep / 2010
  • 1stflr Slab Casting In Progress
  • 1stflr Column Casting In Progress
  • 2nd Flr Column Casting In Progress
  • 1st Flr Slab Completed
30 / Sep / 2010
  • 2ndFLR SLAB COMPLETED FOR 10 NOS OF PLOT
  • G.F COLUMN CASTING IN PROGRESS
  • 2NDFLR SLAB CASTING IN PROGRESS
  • 1STFLR SLAB COMPLETED.
  • 2NDFLR SLAB COMPLETED
  • TERRACE SLAB CASTING IN PROGRESS
30 / Sep / 2010
  • Iris (300 Sqyd) 4 Nos Of Plot
  • 1st & 2nd flr Slab Casting Completed
  • Terrace Shuttering In Progress For
  • 2 Plots.Brick Work In Progress
30 / Sep / 2010
  • Emilia (180 Sqyd)
  • Internal Plaster In Progress
  • Electrical Work In Progress
  • Brick Work In Progress
     
  • Emilia (180 Sqyd)
  • External Plaster In Progress
  • Electrical Work In Progress
  • Brick Work In Progress
30 / Sep / 2010
  • Iris (300 Sqyd)
  • Column Casting In Progr
  • Ess2nd Flr Slab Casting For 2 Plot In Progress
30 / Sep / 2010
  • Excavation Completed For 08 Nos Of Type-E (400 Sqyd) Plot
30 / Sep / 2010
  • Excavation completed for 08 nos of bellevue (240 sqyd.) Plots
30 / Sep / 2010

Tower-C

  • 3rd flr Slab Casting Completed
  • 4th flr Slab Shuttering In Progress
30 / Sep / 2010

Tower-B2

  • Tie Beam Casting Completed
  • column Casting In Progress
30 / Sep / 2010
  • Footing work in progress for 03 nos of type –e (400 sqyd.) Plotstype
30 / Sep / 2010

Tower-B1

  • 2nd flr Column Casting In Progress
  • 2nd flr Slab Casting In Progress
27 / Sep / 2010

CITY HOMES-(BLOCK-A1-&-A2)

27 / Sep / 2010

CITY HOMES-(BLOCK-A5-&-A6)

27 / Sep / 2010

Gurgaon-21-(TOWER-F2)

27 / Sep / 2010
27 / Sep / 2010

Gurgaon - 21 -(TOWER-C)

27 / Sep / 2010

Sec-82E-(EMILIA)

27 / Sep / 2010

Sec-82E-(EMILIA.)

27 / Sep / 2010

Sec-82F-(EMILIA1)

27 / Sep / 2010

Sec-82F-(EMILIA2)

27 / Sep / 2010

Sec-82B-(PRIMROSE)

27 / Sep / 2010

Gurgaon - 21 - (TOWER-D)

27 / Sep / 2010
27 / Sep / 2010

Gurgaon-21-(TOWER-F1)

27 / Sep / 2010

Sec-82B-(IRIS-4)

27 / Sep / 2010

Sec-82E-(IRIS-1)

27 / Sep / 2010

Sec-82E-(IRIS-3)

27 / Sep / 2010

Sec-82F-(IRIS1)

27 / Sep / 2010

Sec-82F-(IRIS)

27 / Sep / 2010

Sec-82B-(PRIMROSE-1)

27 / Sep / 2010
27 / Sep / 2010

Sec-82C-(PRIMROSE-3)

27 / Sep / 2010

Sec-82B-(EMILIA)

27 / Sep / 2010

Sec-82E-(EMILIA-1)

27 / Sep / 2010

Sec-82E-(EMILIA-3)

27 / Sep / 2010

Sec-82E-(EMILIA-4)

27 / Sep / 2010

Sec-82E-(EMILIA-5)

27 / Sep / 2010

Sec-82E-(EMILIA-6)

27 / Sep / 2010

Sec-82B-(IRIS-1&2)

27 / Sep / 2010

Sec-82C-(PRIMROSE-4)

27 / Sep / 2010

Sec-82C-(PRIMROSE)

27 / Sep / 2010

CITY HOMES1

27 / Sep / 2010

Gurgaon-21-(TOWER-A)

27 / Sep / 2010

Gurgaon - 21 - (TOWER-A)

06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010
06 / Sep / 2010